Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

This alert indicates the failure of the Protected Domain Recovery operation (Failover, Failback, or Restore). JetStream Task log will also report this failure

image-20240621-050411.pngImage Added

image-20240619-141241.pngImage Modified

  • The protected domain shutdown at the primary site does not complete properly during a Planned or Regular Failover.

  • Manually terminating an ongoing Continuous Failover (CFO) task could lead to this alert.

  • Failure to take ownership of the protected domain.

  • The process of rehydrating VM data from the object store got interrupted.

...